Summary of proposed works
The main works will include:
- Bus corridors
- Cycle lanes
- Improving pedestrian facilities
- Streetscape in town centre
- Upgrading public lighting
- Pavement overlay
- Signalising junctions
- Utility services
- New storm water sewer
- New foul water sewer
- New watermains
The works required for the Ballincollig Green Route Contract are primarily along the R608 and extents between
Classes Estate (west of Ballincollig) and Poulavone Roundabout (east of Ballincollig) to Inchigaggin Lane on the Model Farm Road
and from Poulavone Roundabout to Inchigaggin Lane on the N22 Carrigrohane Road. The works for the
Water Services part of the Contract are primarily along the R608 from Oriel House Hotel to Poulavone Roundabout.
The works for the Green Route and Water Services have been amalgamated together into a single contract in order to reduce the likelihood
of delay claims and reduce the overall cost of the contracts through economies of scale.
The works have been broken into the following 8 sections:
1) Poulavone Roundabout - Leo Murphy Road
2) Leo Murphy Road - Station Road
3) Station Road - Barrys Road
4) Barrys Road - West End
5) Poulavone Roundabout - Inchigaggin Lane (N22)
6) West End - Classes
7) Poulavone Roundabout - Inchigaggin Lane (Model Farm Road)
8) Poulavone Roundabout - West End (for the pavement overlay)
Works along Main Street
The streetscape along Ballincollig Main Street will be upgraded from the Topaz Garage/Multi-storey car park
to the entrance of Castlepark Estate (west of Leo Murphy Road). Click on the Main Street Ballincollig proposed streetscape plan
red marker/hyperlink in the Google mapping above to view a layout plan image of the works. The paving and appearance of the streetscape
upgrade will mirror the new shopping centre streetscape.
The works will include:
- New paving/footpaths
- Undergrounding services
- Landscaping
- Pavement overlay
- Pedestrian crossing points
- Bus shelters
- Street furniture
New Lighting
New public lighting will be
installed from the West End
Roundabout to Poulavone Roundabout
and to Inchigaggin Lane (N22 and
Model Farm Road)
Decorative lighting will be
installed from the Topaz Garage/
Multi-storey car park to
Castlepark Estate
New traffic signals
New traffic signals will be installed at:
- Classes Estate
- West End
- Muskerry
- Topaz Garage (pedestrian signals)
- Town Square (pedestrian signals)
- East Town Centre/Harrington Street
- Leo Murphy Road/Kilumney Road
- East Gate (Gun Powder Mills)
- Main street/Leo Murphy Road
- Manor Hill (pedestrian signals)
- 3 No. Toucan Crossings around
Poulavone Roundabout
Water Services
-The installation of a storm sewer
(225-525mm diameter precast concrete)
from Oriel House Hotel to Rosewood Estate,
east of Leo Murphy Road
-The installation of a foul sewer
(300-525mm diameter precast concrete)
from east of Leo Murphy Road to Poulavone Roundabout
-The installation of a watermain
(300mm diameter ductile iron)
from Station Road to Poulavone Roundabout